Lucktime Ltd and Others v. Yam Do Kai Peter, The Executor of the Estate of Yam Kung Yin Shang also known as Kung Yin Shang (or Sheung) also known as Kung Wing Har, Deceased and Others
|
LDCS 1000/2024 [2026] HKLdT 31 IN THE LANDS TRIBUNAL OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION LAND COMPULSORY SALE MAIN APPLICATION NO 1000 OF 2024 __________________________
__________________ JUDGMENT __________________ BACKGROUND 1.This is the applicants’ application for an order for sale (“the Application”), for the purposes of redevelopment under the Land (Compulsory Sale for Redevelopment) Ordinance, Cap 545 (“the Ordinance”), of all the undivided shares of and in the following lots (collectively referred to as “the Lot” where appropriate) with the corresponding buildings (“the Buildings”) erected thereon:
2.Standing on the Lots is a pair of 8-storey tenement blocks fronting onto Whampoa Street, each of which is served by 2 common staircases. 3.Occupation permit No K15 of the 1st Building was issued on 13 March 1957, granting permission to occupy its ground floor (“G/F”) for non‑domestic purpose and upper floors for domestic purpose. According to the approved building plans of the 1st Building dated 5 September 1956, there are two shops on G/F, one at G/F, 18 Whampoa Street, and another at G/F, 20 Whampoa Street. The rear side of the two shops, that is 18A Whampoa Street and 20A Whampoa Street respectively, being separated by the two common staircases in the middle, are designed for storage purposes. 4.Each of the upper floors of the 1st Building comprised originally 4 domestic units. 5.By reference to the Second Schedule to the Deed of Mutual Covenant of the 1st Building dated 20 September 1957, each of the units mentioned above has been allotted one equal undivided share of the 1st Lot. 6.On 6 December 2024 when the applicants filed the Notice of Application, the ownership of the 1st Building is shown as follows:
7.Thus, insofar as the 1st Lot is concerned, the applicants altogether own 70.31% of the equal undivided shares in the 1st Lot. 8.On the other hand, Lucktime Limited, ie the 1st Applicant, has been the registered owner of all undivided shares of the 2nd Lot. The 2nd Building erected thereon was also completed in 1957 with Occupation Permit No K23 issued on 16 April 1957. 9.Indeed, the 2nd Lot was the subject of an earlier compulsory sale application, being Lucktime Limited v Cho Kai Fung & Others, LDCS 2000/2018, the sale order of which was granted by the Tribunal on 29 January 2021. Particulars of the 2nd Lot and the 2nd Building thereon can be found in the contents of that judgment. THE REMAINING RESPONDENTS 10.By reference to the table of ownership in §6 above, the applicants altogether own 70.31% of the equal undivided shares in the 1st Lot. There are 8 live respondents (collectively referred to as “the Remaining Respondents”):
11.More particularly, R1 reached full settlement with the applicants through mediation on 25 February 2025. Leave was granted to R1 to withdraw his Notice of Opposition by H H Judge Michelle Lam pursuant to the Order dated 14 March 2025. R1 was also excused from attending the trial. 12.R3 and the 1st, 2nd and 4th named R5 cannot be found. Substituted service of the Application on them was effected on 17 October 2025 pursuant to the Order of H H Judge Michelle Lam dated 8 October 2025. None of them have showed up after expiration of the 21-day period as specified respectively in the notices. 13.Pursuant to paragraphs 1 and 4 of the aforesaid Order, service of the aforesaid Order, the Notice of Application, Mediation Certificate, Mediation Notice and all subsequent documents in the present proceedings on R3 and the 1st, 2nd and 4th named R5 was dispensed with. 14.According to paragraph 3 of the aforesaid Order, after expiration of 21 days from the publication of the notices mentioned in paragraph 12 above, R3 and the 1st, 2nd and 4th named R5 shall be bound by the proceedings as if they have been duly served with the Application in accordance with section 3(3)(a) of the Ordinance. 15.Madam Leung Yuk Chun, the 3rd named R5, was subsequently joined pursuant to an Order dated 25 March 2026 by H H Judge Michelle Lam in her capacity as the administratrix of the estate of Chan Tak Ping, deceased. Madam Leung has confirmed to the Tribunal that she will not oppose the Application and will not attend the trial. She also undertook not to seek costs against the applicants in these proceedings up to and inclusive of the trial. Accordingly, Madam Leung was excused by the order of H H Judge Michelle Lam from attending the trial. It was also ordered that “there be no filing of Notice of Opposition (Form 33) by the 3rd named R5 in these proceedings” and that “there be no adducing of any evidence, whether expert or factual, in opposition to these proceedings by the 3rd named R5. 16.R2, R4, R6, R7 and R8 are represented by Messrs Peter Mo & Co. They have entered into Provisional Agreements for Sale and Purchase on 28 April 2026 for selling their properties to A1. The transactions will be completed in due course. Leave was granted to R2, R4, R6, R7 and R8 to withdraw all their Notices of Opposition and evidence (whether factual and expert) on 30 April 2026. ISSUES FOR DETERMINATION BY THE TRIBUNAL 17.The remaining issues to be decided in this case are as follows:
SECTION 3 OF THE ORDINANCE – OWNERSHIP OF THE APPLICANTS 18.At the time of filing of the Application on 6 December 2024, the amendments to the Ordinance passed in July 2024 came into operation. 19.By virtue of the newly amended section 3(2)(c) of the Ordinance, the person or persons who owns or own, otherwise than as a mortgagee, not less than 90% of the undivided shares in a lot may make an application which may cover 2 or more lots that are adjoining lots (one set of adjoining lots) even if any of the lots is wholly owned by the majority owner. This is exactly the case for the captioned application when the applicants have owned 100% of the 2nd Lot. 20.Section 3(5) of the Ordinance provides that the Chief Executive in Council may, by notice in the Gazette, specify a lower percentage in respect of a lot belonging to a class of lots specified in that notice. 21.The Land (Compulsory Sale for Redevelopment) (Specification of Lower Percentage) Notice (“the Notice”) was similarly amended in December 2024. Section 3 of the Notice lowered the threshold for compulsory sale of specified classes of lots from 90% to 70%. Those classes of lots include:
22.At the time of filing the Application, the Lots were included in the Approved Hung Hom Outline Zoning Plan No S/K9/28 dated 10 June 2022 and hence, they were not located within any of the “designated areas” set out in the Schedule to the Notice. Since the occupation permits of the Buildings were both issued in 1957, i.e. more than 60 years but less than 70 years before the date of application (i.e. 6 December 2024, the relevant date under the Notice), the applicable percentage is therefore 70%. 23.Section 3(8)(c) of the Ordinance also provides that where 2 or more lots are adjoining lots, the averaging requirement is fulfilled for 2 or more lots if the average of the percentage of the undivided shares owned by the majority owner in the lots (“averaged ownership percentage”) is not less than the specified threshold percentage, where—
24.The 1st Lot has a site area of 3,400 sq ft while the 2nd Lot has a site area of 4,675 sq ft. Pursuant to the above, the average ownership percentage owned by the applicants altogether is 87.5%: 25.I am satisfied that as at the date of the Application, the applicants altogether owned more than 70% of the undivided shares in the Lots. I am therefore satisfied the applicants altogether are entitled to make the present application under section 3 of the Ordinance. SECTION 4(2) OF THE ORDINANCE - JUSTIFICATION AND REASONABLE STEPS 26.Section 4(2) of the Ordinance provides as follows: -
Whether development of the Lot is justified due to the age and/or state of repair of the Building 27.However, section 4(2C) of the Ordinance as amended expressly provides that subsection (2) afore-stated does not apply to a lot which is wholly owned by the majority owner, ie the applicants in the present proceedings. 28.Accordingly, the Tribunal is not required to consider whether redevelopment of the 2nd Building is justified or not. 29.In respect of the 1st Lot, the applicants have appointed Mr Wong Wing Cheung, Dennis (“Mr Dennis Wong”) who is a Registered Professional Surveyor (Building Surveying), Authorized Person and Registered Structural Engineer to prepare a Condition Survey Report and a Structural Assessment Report both dated 21 July 2025. 30.In respect of the age of the 1st Building, Mr Dennis Wong highlighted that it was 68 years old. Due to changes in statutory requirements, advanced technology and higher expectation of the owners over the years, the 1st Building has become substandard and obsolete in respect of the following aspect when compared to a new building if the site is redeveloped:
31.More particularly, there are vital deficiencies that cannot be overcome but have an adverse effect on the users in various aspects, including but not limited to:
32.Mr Dennis Wong was also of the view that the 1st Building is in a poor state of repair. According to him, the costs of essential repairs amounted to $12,631,247 or $7,523.57 per m2 of the existing Gross Floor Area of the 1st Building. This unit cost is about 46.96% of the unit cost of $16,019.81 per m2 for re-constructing a new similar building. Mr Dennis Wong opined that the rectification/ repair costs were relatively high. 33.Turning to the structural assessment of the 1st Building, Mr Dennis Wong found a substantial number of defects such as cracks and spalling. In the open-up inspection, 26/87 or 29.9% of the steel reinforcement bars were under the classification of “Severe Corrosion”, 67/87 or 77.0% were seriously corroded according to the classification by Code of Practice of the Mandatory Building Inspection Scheme (MBIS) 2012. The effect of serious corrosion can result in a reduction in the load-carrying capacity of the structural members and impair the building structure as a whole. 34.In addition, 100% of the slab and 65.5% of the beam samples failed to satisfy the minimum concrete cover requirement of the Code of Practice for Structural Use of Concrete 2013 (“2013 Concrete Code”). 88.9% of all samples failed to satisfy the minimum concrete strength requirement of 20 MPa as specified in the code. 35.Also, all the samples had carbonation reaching a depth greater than the concrete cover. This implies that the protective barrier of the reinforcement bars has been lost, allowing active deterioration/ corrosion of the reinforcement bars to develop. Similarly, 72% of the test samples failed to meet the maximum chloride content of 0.35%, some with chloride contents as high as 3.21%. 36.Mr Dennis Wong has summarised the structural conditions of the 1st Building as follows:
37.In view of the above, Mr Dennis Wong considered that the 1st Building had passed its design working life of 50 years on which basis the requirements of the 2013 Concrete Code were set up. 38.There is no expert evidence to rebut the reports complied by Mr Dennis Wong. 39.Having considered the reports of Mr Dennis Wong, I accept his expert opinion. The 1st Building, being erected more than 69 years ago, is in poor condition and has come to the end of its design life. The design of the 1st Building has become obsolete over time in many aspects, both physically and functionally, and fails to conform to modern safety standards and statutory requirements. 40.I am satisfied that the 1st Building is in poor state of repair and the costs of repair to bring the 1st Building to tenantable condition is disproportionate to the costs of redevelopment. Even if repair works are carried out, such works will bring about a modest improvement only to the existing condition of the 1st Building and the 1st Building will continue remain a sub-standard one. 41.By reason of the matters set out above, I am satisfied that the redevelopment of the 1st Building is justified. Whether the applicant has taken reasonable steps 42.In assessing the reasonableness of the offers, I have considered the case of Capital Well Ltd v Bond Star Development Ltd (2005) 8 HKCFAR 578. In particular, I have considered paragraphs 33 and 36 of the judgment in which Ribeiro PJ stated: -
43.Firstly, at the date of the Application, the applicants already owned 70.31% of the undivided shares of and in the 1st Lot. Ms Nancy Ngai (“Ms Ngai”), counsel of the applicants, submitted that the applicants could have applied for an Order for sale of the 1st Lot alone pursuant to section 3(1) of the Ordinance. Nevertheless, the applicants did not do so. Instead, by adding the 2nd Lot which had been wholly owned by the 1st applicant in the Application, a larger site was resulted, rendering a more viable development and more compensation to the minority owners of the 1st Lot. Ms Ngai submitted that the applicants had taken not only a fair and reasonable step but a generous step in favour of the minority owners of the 1st Lot. 44.Despite the applicants have commenced the Application, they continued to negotiate with the minority owners of the 1st Lot with a view to purchasing their properties by negotiation. 45.I agree also that the settlement finally reached with R1, R2, R4, R6, R7 and R8 provides solid evidence for proving that the applicants have indeed taken reasonable steps to acquire the undivided shares owned by the respondents. 46.I accept that the applicants have not been able to acquire the undivided shares of and in the 1st Lot owned by R3 and the 1st, 2nd and 4th named R5 solely because they could not (and still cannot) be found. 47.On 17 April 2026, the 3rd named R5 confirmed that she would not oppose the Application. Indeed, after the 3rd named R5 turned up, the applicants made open offers to her for purchasing 1/8 share of 3/F, No 20 Whampoa Street on 2 April 2026 and 24 April 2026 in the amount of $830,000[1] and $870,000[2] respectively.[3] 48.These open offers were made by reference to Mr CW Wong’s independent valuation opinion which will be summarised below. I accept that these open offers were higher than the value attributable to the 3rd named R5’s interest in 3/F, No 20 Whampoa Street calculated in accordance with the statutory formula set out in the Ordinance. 49.By reason of the matters set out above, I am satisfied that the applicants have taken reasonable steps to acquire all the undivided shares in the 1st Lot. 50.While I am satisfied that the redevelopment of the 1st Lot is justified and the applicants have taken reasonable steps to acquire all the undivided shares in the 1st Lot, an order for the sale of both the 1st Lot and the 2nd Lot should be granted in favour of the applicants. DETERMINATION OF THE EUV OF ALL UNITS IN THE 1ST BUILDING 51.Under section 4(1)(a)(i) of the Ordinance, if there is a dispute between the parties on the EUV of the units in the Buildings on the Lots, the Tribunal has to determine the values. 52.Section 4(1)(a)(ii) further provides that, in the case of any minority owner of the 1st Lot who cannot be found, the majority owner of the 1st Lot is required to satisfy the tribunal that the value of the minority owner’s property as assessed in the Application is: -
53.Mr Wong Chi Wai (“Mr CW Wong”) of Grandmax Surveyors Limited has been appointed by the applicants to prepare the following reports:
54.In the Valuation Report of 4 December 2024 (“the Application Report”), Mr CW Wong explained the method of valuation and the process of his assessment to arrive at the EUV of each unit of the 1st Building. 55.In his valuation of the EUV of the domestic units on the upper floors of the 1st Building, Mr CW Wong adopted the following methodology:
56.In assessing the EUV of the ground floor units, Mr CW Wong adopted the following methodology:
57.Mr CW Wong updated the Application Report by another report dated 17 July 2025 (ie the Supplemental Report) in which he revised the EUV of all the units in the 1st Buildings after taking into account the inspection of more units in the 1st Building and the updated property index prepared by the Rating and Valuation Department. In this report, Mr CW Wong found 4 more up-to-date comparables and repeated the exercise he did in the Application Report. He arrived however at the same rate of $63,000 per m2 as the unit price of the Reference Domestic Unit. 58.Similarly, Mr CW Wong found 2 more up-to-date comparables for the ground floor shop units. This time, he arrived at $301,000 per m2 as the unit price of the Reference Shop Unit. 59.The updated EUV of all the units in the 1st Building as assessed by Mr CW Wong is set out in the following table:[4]
60.Thus, the total EUV of the 1st Building as assessed by Mr CW Wong as at 15 November 2024 is $117,450,000. 61.I am satisfied that the value of the respondent unit as assessed by Mr CW Wong is not less than fair and reasonable; and not less than fair and reasonable when compared with the value of the applicants’ properties. RDV FOR THE 1ST LOT AND THE 2ND LOT 62.Paragraph 2 in Part 3 of Schedule 1 to the Ordinance as amended provides that, for an order for sale of lots the subject of an application that covers more than one lot, the proceeds of sale of the lots—
63.As a result of paragraph 62 (a)(i) above, Mr CW Wong had prepared valuations on the RDV of the 1st Lot and the RDV of the 2nd Lot as at 15 November 2024 by means of the residual valuation method. This can be done by deducting development cost (including construction costs, professional fees, finance costs etc) and developer’s profit from the estimated gross development value (“GDV”) of the completed optimum development. 64.In arriving at the GDV of each hypothetical development, Mr CW Wong had gathered the relevant sales comparables and repeated the exercises of what he had done in assessing the EUV of each unit of the 1st Building save that this time, the sales comparables are sales of relatively new properties. 65.Mr CW Wong then assessed the construction and demolition costs by reference to the “Building Cost Data for Private Sector Developments in Hong Kong” prepared by Rider Levett & Bucknall which is a popular international quantity surveying consultancy firm in the real estate and construction industry. 66.Mr CW Wong also explained that in considering the plenty supply for new domestic units in the Hung Hom locality, a 20% profit would have fairly reflected the project risk and return of these hypothetical developments for either the 1st Lot or the 2nd Lot as at 15 November 2024. 67.Mr CW Wong arrived at the RDV of the lots at $118,000,000[6] and $229,000,000[7] respectively. 68.The significant difference between the two values can firstly be explained by the difference in site areas between the two lots. According to Mr CW Wong, the 1st Lot has a net site area of 306.87 sq m while the 2nd Lot has a net site area of 434.32 sq m. While they fell within an area designated as “Residential (Group A) 4” on the Approved Hung Hom Outline Zoning Plan No S/K9/28 dated 10 June 2022, under this zoning designation, a maximum building height restriction of 100mPD would be permitted for sites with an area of 400 m2 or more[8]. Otherwise, like that of the 1st Lot, the maximum building height restriction would be only 80mPD. 69.In addition, the 2nd Lot, being a corner lot, enjoys shop frontages on two streets and a higher plot ratio under the Building (Planning) Regulations as a Class B site. RESERVE PRICE FOR THE AUCTION 70.In his latest valuation report dated 26 March 2026, Mr CW Wong proceeded to update the RDV of both the 1st Lot and the 2nd Lot, taking into account the joint redevelopment potential of the Lots on their own by the residual valuation method. 71.Mr CW Wong arrived at $580,000,000 which is equivalent to an accommodation value of $85,904 per m2. A copy of his calculation is attached herein as Appendix 1[9]. 72.I have gone through Mr CW Wong’s valuation. In the absence of evidence to the contrary, I am satisfied with his valuation, including the valuation assumptions he has adopted, the values and the costs parameters he has used in his valuation. 73.Based on Mr CW Wong’s valuation, therefore, I decide that the reserve price for the auction of both the 1st Lot and the 2nd Lot together should be HK$580,000,000. ORDERS 74.For reasons given in this judgment, I have set out reasons why I am satisfied an order for sale should be granted and I therefore make the following orders: -
COSTS 75.There be no order as to costs. Unless any parties apply by summons to vary, the costs order nisi shall be made absolute upon expiry of 14 days from the date of this judgment.
Ms Nancy Ngai, instructed by Zhong Lun Law Firm LLP, for the applicants Attendance of the 1st respondent and 3rd named 5th respondent who were not legally represented was excused Attendance of Messrs Peter Mo & Co, for the 2nd, 4th, 6th, 7th & 8th respondents, was excused 3rd respondent and 1st, 2nd and 4th named 5th respondents, absent Appendix 1
[1] See Bundle D3/1579-1584. [2] See Bundle D4/1626-1631. [3] See also Annex B of Ms Ngai’s opening submission dated 29 April 2026. [4] See Bundle F1/1955. [5] According to Mr CW Wong, the Front Portion and the Rear Portion of 4/F have become a single unit. [6] See Bundle F2/2075. [7] See Bundle F2/2082. [8] See Bundle F1/1862. [9] See Bundle F4/2515. [10] See Bundle D4/1696. [11] See Bundle D4/1657-1693. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cases cited in this judgment
Lucktime Ltd and Others v. Yam Do Kai Peter, The Executor of the Estate of Yam Kung Yin Shang also known as Kung Yin Shang (or Sheung) also known as Kung Wing Har, Deceased and Others
Lucktime Ltd and Others v. Yam Do Kai Peter, The Executor of the Estate of Yam Kung Yin Shang also known as Kung Yin Shang (or Sheung) also known as Kung Wing Har, Deceased and Others
New Merit Ltd v. Lau So and Another
Joint Hope Ltd v. Vecent Hong Kong Trading Ltd and Others
Other judgments that cite this case
Further hearings and rulings under LDCS 1000/2024
